Lanco Power International Pte Ltd. will develop a gas based combined cycle power plant on 12.32 acres land at Kutuba union of Barhanuddin upazila under Bhola district. This project consists of one (1) Gas Turbine Generator (GT), One (1) Heat Recovery Steam Generator (ST) an 00d one (1) Steam Turbine Generator (STG), 36,000 m3 HSD storage facility, a 60 m stack and 2 km gas pipeline. The project will require approximately 7.6 m3/s water sourced from Dehular canal and 30-35 mm gas during operation phase.